Why does a smaller order sometimes have a longer lead time?
Small batch manufacturing with low MOQs often has a longer per-unit lead time than large-scale production due to setup inefficiencies, specialized scheduling, and the fixed overhead of quality control and material sourcing, which are distributed across fewer items, making each piece more time-intensive to produce. Why does low MOQ production sometimes have a longer lead […]
Why does a smaller order sometimes have a longer lead time? Read More »